Sub-Area Plan Development |
| Date Uploaded |
File |
| Nov. 17, 2011 |
Concept 1 - "Business As Usual" |
| Nov. 17, 2011 |
Concept 2 - "Mixed Use Node Corridor" |
| |
Corridor Plan Development: December 16th Design Charrette |
| Date Uploaded |
File |
| Jan. 10, 2012 |
Draft Preferred Corridor Land Use Scenario |
| Jan. 10, 2012 |
Preferred Land Use Scenario with Aerial |
| Jan. 10, 2012 |
Transit Corridor Rendering at 1788 Mixed Use Node |
| Jan. 10, 2012 |
Corridor Drainage Concepts |
| Jan. 10, 2012 |
Minor Drainage Concept |
| Jan. 10, 2012 |
Backage Road Options (B-1) |
| Jan. 10, 2012 |
Transit Corridor Backage Road Initial Section (B-2) |
| Jan. 10, 2012 |
Transit Corridor Backage Road Longterm Section (B-2) |
| |
SH191 Corridor Sub-Area Thoroughfare Plan |
| Date Uploaded |
File |
| Jan. 5, 2012 |
SH191 Corridor Sub-Area Draft Interim Thoroughfare Plan 11x17 |
| Jan. 5, 2012 |
SH191 Corridor Sub-Area Draft Interim Thoroughfare Plan 36x48 |
|