Freese and Nichols, Inc. Midland/Odessa MOTOR

To view a document listed below, you can either click the link or right click and save it to your desktop

Sub-Area Plan Development

Date Uploaded File
Nov. 17, 2011 Concept 1 - "Business As Usual"
Nov. 17, 2011 Concept 2 - "Mixed Use Node Corridor"
 

Corridor Plan Development: December 16th Design Charrette

Date Uploaded File
Jan. 10, 2012 Draft Preferred Corridor Land Use Scenario
Jan. 10, 2012 Preferred Land Use Scenario with Aerial
Jan. 10, 2012 Transit Corridor Rendering at 1788 Mixed Use Node
Jan. 10, 2012 Corridor Drainage Concepts
Jan. 10, 2012 Minor Drainage Concept
Jan. 10, 2012 Backage Road Options (B-1)
Jan. 10, 2012 Transit Corridor Backage Road Initial Section (B-2)
Jan. 10, 2012 Transit Corridor Backage Road Longterm Section (B-2)
 

SH191 Corridor Sub-Area Thoroughfare Plan

Date Uploaded File
Jan. 5, 2012 SH191 Corridor Sub-Area Draft Interim Thoroughfare Plan 11x17
Jan. 5, 2012 SH191 Corridor Sub-Area Draft Interim Thoroughfare Plan 36x48